Development will comprise the construction of 8no detached and semi-detached properties on the site of the former Zion Methodist Chapel.
WML prepared design and construction level drawings for the new below ground sewers and private drainage networks to serve the development, foundations etc together with Phase 1 Desk Study, Phase 2 investigations together with geotechnical and Geoenvironmental interpretative reports.